Home> Blog> Precautions When Using Tunnel Trolley

Precautions When Using Tunnel Trolley

December 10, 2020

Precautions When Using Tunnel Trolley


The tunnel trolley is a kind of special equipment in the process of industrial sound field, which is fast in mold loading and stripping, which can increase the construction speed and reduce labor intensity. The tunnel trolley has the characteristics of fast speed, cost saving and labor reduction. The main precautions when using the tunnel trolley are as follows:

1. Before using the tunnel trolley, you must strictly follow the requirements of the operation manual to protect your personal and property safety, and the Highway Tunnel Trolley must be maintained and maintained frequently to extend its service life.

2. Before use, install the tunnel trolley according to the operation manual. During the installation, check whether the connections are firmly connected. After installation, try it once to see if the trolley rotates flexibly. Chengdu Laixin reminds everyone to park the tunnel trolley to the corresponding position after the installation is completed.


Precautions When Using Tunnel Trolley


3. After the tunnel trolley has reached the corresponding position, it will start to erect the membrane, start the switch, and the operator will cooperate with the trolley to make the shape of the formwork meet the construction requirements. After the formwork meets the construction requirements, the upper and lower formwork are precisely combined. Then close the template around the trolley. After the two forms are assembled up and down, the concrete is poured into the Formwork Trolley. The tunnel trolley renter reminds everyone that the force of the trolley must be balanced during the concrete pouring process, because if the force of the trolley is not balanced, it is likely to overturn, which will lead to safety accidents and not only cause losses to the construction unit , But also cause personal and property safety to operators.

4. After demoulding, when the strength of the concrete reaches the operational requirements, demoulding can be performed. When demolding, first remove the templates around the front and rear of the cart, because during the demolding process, the templates around the trolley hinder the movement of the trolley, which may cause the trolley to fail to demold smoothly.


Contact Us

Author:

Ms. Emma

Phone/WhatsApp:

+8615942219460

Popular Products
You may also like
Related Information
Precautions for making and installing concrete formwork for track and field venues

The location and elevation of the concrete structures on the track and field venues are directly related to the production and installation of the formwork. The templates are made well and the...

High Performance Precast Coatings Launched

A few days ago, the newly developed prefabricated marking paints of Xinhua Paint Co., Ltd. of Hengshui City, Hebei Province, were successfully put on the market. This product fills a gap in China's...

Cantilever Impact Tester Operation Principle

Material impact detection, introduced to the operating principle of the cantilever beam impact testing machine complex and changeable, Jinan Yongmao Machinery Co., Ltd. Technical Department careful...

Research on Energy Saving Technology in Construction of Civil Engineering and Civil Engineering

Research on Energy Saving Technology in Construction of Civil Engineering and Civil Engineering Core Tip: Feng Wenqing (Mudanjiang Everbright Construction and Installation Engineering Co., Ltd.,...

Related Categories

Email to this supplier

Subject:
Mobile:
Email:
Message:

Your message must be betwwen 20-8000 characters

Contact Us

Author:

Ms. Emma

Phone/WhatsApp:

+8615942219460

Popular Products
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send